RM新时代app下载-首页

    <menu id="icv9r"></menu>
    <dd id="icv9r"><meter id="icv9r"></meter></dd>
    <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
    1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

      1. Welcome to濟南濟柴環(huán)能燃氣發(fā)電設備有限公司official website!

        Contact information

        Tel:
        +86-531-88012499
        Mob:
        +86-18668968402
        +86-18678860619
        Fax:
        +86-531-69958299
        Email:
        greenpowercn@126.com
        Address:
        Building 8, Shuntai Square, Shunhua Road,High-tech Zone, Jinan City, PRC

        Gas power generation project

        山西20×500

        Create a project and build a monument

        Case Introduction
        • Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finish
        • 總體情況介紹:

          山西20

          Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finished)

          The gas spray conveying pipe is not insulated near the generator room. (finished)

          Intake branch line arrester support did not reach the ground. (finished)

          There is more oil accumulation under the generator set, and effective measures should be taken to discharge it to the outside, and it is strictly prohibited to exist at the bottom of the unit or in the cable trench. (Cleaned up, take each shift to clean the oil at the bottom of the unit)

          The drainage and exhaust of the generator set shall be handled according to the regulations, resulting in outdoor. (Completed, the drain has been blocked by wire, and the discharge water is discharged by regular pipe)

          The surface of the pressure gauge of the branch water pipeline is much oily, and the unit has the phenomenon of oil leakage. (finished)

        Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
        • 服務(wù)熱線(xiàn)

          0531-62325028
          0531-69951266

        山西20×500

        Do a project, build a monument

        Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finish

        山西20

        Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finished)

        The gas spray conveying pipe is not insulated near the generator room. (finished)

        Intake branch line arrester support did not reach the ground. (finished)

        There is more oil accumulation under the generator set, and effective measures should be taken to discharge it to the outside, and it is strictly prohibited to exist at the bottom of the unit or in the cable trench. (Cleaned up, take each shift to clean the oil at the bottom of the unit)

        The drainage and exhaust of the generator set shall be handled according to the regulations, resulting in outdoor. (Completed, the drain has been blocked by wire, and the discharge water is discharged by regular pipe)

        The surface of the pressure gauge of the branch water pipeline is much oily, and the unit has the phenomenon of oil leakage. (finished)

        RM新时代app下载-首页

          <menu id="icv9r"></menu>
          <dd id="icv9r"><meter id="icv9r"></meter></dd>
          <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
          1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

              1. <menu id="icv9r"></menu>
                <dd id="icv9r"><meter id="icv9r"></meter></dd>
                <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
                1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

                  1. RM新时代平台网址 RM新时代新项目-百度知道 RM新时代官网 RM新时代新项目-百度知道 RM新时代平台网址 rm新时代足球交易平台 新时代官方下载 RM新时代怎么下载 RM新时代网站 RM新时代正规平台入口