RM新时代app下载-首页

    <menu id="icv9r"></menu>
    <dd id="icv9r"><meter id="icv9r"></meter></dd>
    <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
    1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

      1. Welcome to濟南濟柴環(huán)能燃氣發(fā)電設備有限公司official website!

        Contact information

        Tel:
        +86-531-88012499
        Mob:
        +86-18668968402
        +86-18678860619
        Fax:
        +86-531-69958299
        Email:
        greenpowercn@126.com
        Address:
        Building 8, Shuntai Square, Shunhua Road,High-tech Zone, Jinan City, PRC

        Gas power generation project

        Shanxi 15MW coal mine gas power generation project

        Create a project and build a monument

        Case Introduction
        • List the emergency plan of hidden dangers and dangerous points, establish the registration system of
        • 總體情況介紹:

          山西15

          List the emergency plan of hidden dangers and dangerous points, establish the registration system of entering the power station, and improve the assessment system of the power station. (Emergency plan and system have been established and perfected)

          The sign on the pipe between the gas pump house and the power station is not clear. (Re-customized sign and posted)

          Gas generator adopts 400V low voltage grid-connected, need to develop special measures to standardize grid-connected operation. (Developed and made for wall hanging)

          If the problem involves the manufacturer, the installer will reflect it to the manufacturer and come up with specific handling suggestions. (The problem has been copied and reported to the manufacturer)

          The smoke exhaust pipe has no insulation measures, and the explosioning device is located in the generator room. Isolation measures and warning signs should be taken outside the room. (Flue heat insulation measures have been completed, explosive-discharge device has been contacted by the manufacturer must be issued by the manufacturer and implemented)

          The gas power station shall be included in the scope of safety production inspection of the Shuileng mine, and the Shuileng mine shall carry out safety inspection and evaluation on a regular basis, and the inspection contents shall be reported to the power supply Department and the Safety supervision Bureau.

        Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
        • 服務(wù)熱線(xiàn)

          0531-62325028
          0531-69951266

        Shanxi 15MW coal mine gas power generation project

        Do a project, build a monument

        List the emergency plan of hidden dangers and dangerous points, establish the registration system of

        山西15

        List the emergency plan of hidden dangers and dangerous points, establish the registration system of entering the power station, and improve the assessment system of the power station. (Emergency plan and system have been established and perfected)

        The sign on the pipe between the gas pump house and the power station is not clear. (Re-customized sign and posted)

        Gas generator adopts 400V low voltage grid-connected, need to develop special measures to standardize grid-connected operation. (Developed and made for wall hanging)

        If the problem involves the manufacturer, the installer will reflect it to the manufacturer and come up with specific handling suggestions. (The problem has been copied and reported to the manufacturer)

        The smoke exhaust pipe has no insulation measures, and the explosioning device is located in the generator room. Isolation measures and warning signs should be taken outside the room. (Flue heat insulation measures have been completed, explosive-discharge device has been contacted by the manufacturer must be issued by the manufacturer and implemented)

        The gas power station shall be included in the scope of safety production inspection of the Shuileng mine, and the Shuileng mine shall carry out safety inspection and evaluation on a regular basis, and the inspection contents shall be reported to the power supply Department and the Safety supervision Bureau.

        RM新时代app下载-首页

          <menu id="icv9r"></menu>
          <dd id="icv9r"><meter id="icv9r"></meter></dd>
          <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
          1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

              1. <menu id="icv9r"></menu>
                <dd id="icv9r"><meter id="icv9r"></meter></dd>
                <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
                1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

                  1. RM新时代平台网址 RM新时代新项目-百度知道 RM新时代官网 RM新时代新项目-百度知道 RM新时代平台网址 rm新时代足球交易平台 新时代官方下载 RM新时代怎么下载 RM新时代网站 RM新时代正规平台入口