RM新时代app下载-首页

    <menu id="icv9r"></menu>
    <dd id="icv9r"><meter id="icv9r"></meter></dd>
    <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
    1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

      1. Welcome to濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司official website!

        Contact information

        Tel:
        +86-531-88012499
        Mob:
        +86-18668968402
        +86-18678860619
        Fax:
        +86-531-69958299
        Email:
        greenpowercn@126.com
        Address:
        Building 8, Shuntai Square, Shunhua Road,High-tech Zone, Jinan City, PRC

        Natural gas power generation projects

        Xinjiang LNG liquefaction plant 4MW power station

        Create a project and build a monument

        Case Introduction
        • Including large ECU system, generator set controller IG-NTC, signal acquisition module, electronic s
        • 總體情況介紹:

          新疆LN

          Including large ECU system, generator set controller IG-NTC, signal acquisition module, electronic speed regulation, display, DC power supply, etc., the unit control functions are all centralized in the cabinet. Each unit is equipped with one local monitoring cabinet, which is placed on the side of the unit.

          Unit starting, speed regulation, automatic grid connection, power factor control, load loading and load shedding

          Power measurement and display: U, 1, Hz, kW, kVA, PF, kWh

          Alarm and protection: overload/short circuit, over voltage/under voltage, over frequency/under frequency, reverse power, high winding temperature, overspeed, etc

          Various parameters of the collection unit: such as cylinder temperature, exhaust temperature, oil temperature, temperature, oil pressure, speed, gas regulating valve opening, etc

        Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
        • 服務(wù)熱線

          0531-62325028
          0531-69951266

        Xinjiang LNG liquefaction plant 4MW power station

        Do a project, build a monument

        Including large ECU system, generator set controller IG-NTC, signal acquisition module, electronic s

        新疆LN

        Including large ECU system, generator set controller IG-NTC, signal acquisition module, electronic speed regulation, display, DC power supply, etc., the unit control functions are all centralized in the cabinet. Each unit is equipped with one local monitoring cabinet, which is placed on the side of the unit.

        Unit starting, speed regulation, automatic grid connection, power factor control, load loading and load shedding

        Power measurement and display: U, 1, Hz, kW, kVA, PF, kWh

        Alarm and protection: overload/short circuit, over voltage/under voltage, over frequency/under frequency, reverse power, high winding temperature, overspeed, etc

        Various parameters of the collection unit: such as cylinder temperature, exhaust temperature, oil temperature, temperature, oil pressure, speed, gas regulating valve opening, etc

        Next:
        RM新时代app下载-首页

          <menu id="icv9r"></menu>
          <dd id="icv9r"><meter id="icv9r"></meter></dd>
          <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
          1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

              1. <menu id="icv9r"></menu>
                <dd id="icv9r"><meter id="icv9r"></meter></dd>
                <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
                1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

                  1. RM新时代平台网址 RM新时代新项目-百度知道 RM新时代官网 RM新时代新项目-百度知道 RM新时代平台网址 rm新时代足球交易平台 新时代官方下载 RM新时代怎么下载 RM新时代网站 RM新时代正规平台入口