      1. 歡迎進(jìn)入濟南濟柴環(huán)能燃氣發(fā)電設備有限公司官網(wǎng)!

        行業(yè)資訊

        放置了半年的焦化發(fā)電機組需要做哪些檢測

        返回 2022.08.31 來(lái)源:http://m.elmasticar.com 0
        放置了半年的焦化發(fā)電機組需要做哪些檢測呢?實(shí)際上不算很難,一般的要做以下幾點(diǎn)檢查:
        What tests should be done for the coking generator set that has been placed for half a year? In fact, it is not very difficult. Generally, the following checks are required:
        1、檢查機組的啟動(dòng)成功率
        1. Check the startup success rate of the unit
        試驗方法:試驗應在符合產(chǎn)品技術(shù)條件規定的準備啟動(dòng)狀態(tài)下,每給一個(gè)啟動(dòng)指令,啟動(dòng)成功后突加功率為1.0的50% 的額定負載運行5min,再停機。試驗100次。啟動(dòng)成功率應大于99%。否則,則認為此項不合格。
        Test method: the test shall be carried out in the ready to start state in accordance with the technical conditions of the product. After each start command is given, the test shall be conducted with 50% of the rated load of 1.0 for 5min and then shut down. 100 tests. The startup success rate shall be greater than 99%. Otherwise, it is considered as unqualified.
        2、檢查機組平均故障間隔期
        2. Check the mean time between failures of the unit
        檢查方法:機組帶cosФ=0.8的額定負載,連續或累計運行1000h以上,焦化機、發(fā)電機均不應出現故障,控制電路的 元件不應出現二次以上故障,否則,則認為此項不合格。此項指標允許在實(shí)際運行中進(jìn)行考核。
        Inspection method: unit with cos Ф= 0.8 rated load, continuous or cumulative operation for more than 1000h, the coking machine and generator shall not have fault, and the elements of the control circuit shall not have more than two faults, otherwise, this item is considered unqualified. This indicator can be evaluated in actual operation.
        3、檢查機組帶可控硅負載的運行情況
        3. Check the operation of the unit with thyristor load
        試驗方法:機組帶cosФ≥0.5的三相可控硅整流器負載,在機組額定容量的10%~50%范圍內任一點(diǎn)上均應能穩定工作 。如果產(chǎn)生低頻振蕩,應實(shí)行調整,使之能穩定工作,否則認為此項不合格。
        Test method: unit with cos Ф The load of three-phase thyristor rectifier ≥ 0.5 shall be able to work stably at any point within the range of 10% ~ 50% of the rated capacity of the unit. If low-frequency oscillation occurs, it shall be adjusted to make it work stably. Otherwise, it is considered unqualified.
        焦化發(fā)電機組
        4、檢查自動(dòng)化機組的聯(lián)動(dòng)試
        4. Check the linkage test of the automatic unit
        檢查方法:兩臺機組應互為主備用,任選一臺作主用,人為切斷市電,主用機組自動(dòng)啟動(dòng)成功后供電。制造一個(gè)故障 ,使主用機組自動(dòng)停機備用機組則應自動(dòng)成功后供電。使市電恢復后,備用機組應級自動(dòng)停機。如不合格,找出原因,排 除故障。兩臺機組分別為主用,復試三次,如仍有一次不合格,則認為此項不合格。
        Inspection method: two units shall be used as main and standby for each other, and one unit shall be selected as the main one. The mains power shall be cut off manually, and the power supply shall be supplied after the main unit is automatically started successfully. If a fault is caused, the main unit will automatically shut down, and the standby unit will automatically supply power after success. After the mains power is restored, the standby unit shall stop automatically. If unqualified, find out the reason and eliminate the fault. The two units are mainly used and retested for three times. If one is still unqualified, it is considered as unqualified.
        5、檢查自動(dòng)化焦化發(fā)電機組自動(dòng)啟動(dòng)功能
        5. Check the automatic startup function of the automatic coking generator set
        試驗方法:接通啟動(dòng)電源,將機組工作方式選擇開(kāi)關(guān)搬向自動(dòng),送入啟動(dòng)指令,并且人為使機組啟動(dòng)不成功,機組應 自動(dòng)啟動(dòng)三次。
        Test method: connect the startup power supply, move the unit working mode selection switch to automatic, and send the startup command. If the unit fails to be started manually, the unit shall be started automatically for three times.
        試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
        If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
        6、檢查自動(dòng)化機組的自動(dòng)補給裝置
        6. Check the automatic supply device of the automatic unit
        試驗方法:在控制電路電路完全聯(lián)結完畢后,將工作方式選擇開(kāi)關(guān)搬向自動(dòng)人為放水放油至低液位,應能自動(dòng)補給, 當液面上升到高液位時(shí)補給應能自動(dòng)停止。
        Test method: after the control circuit is fully connected, move the working mode selection switch to automatic manual water and oil drainage to the low level, which shall be able to automatically replenish. When the liquid level rises to the high level, the replenishment shall be able to automatically stop.
        試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
        If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
        此外也要檢查自動(dòng)化機組的保護性、檢查自動(dòng)化機組的冷卻水、機油加熱等事項,更多檢查項目合格才能進(jìn)行下一步 使用,詳情就來(lái)我們網(wǎng)站http://m.elmasticar.com聯(lián)系了解吧。
        In addition, it is also necessary to check the protection of the automatic unit, check the cooling water and oil heating of the automatic unit. More inspection items can be used in the next step only if they are qualified. Please visit our website for details http://www.huannengpower. Contact me to understand.
        新聞搜索
        濟南濟柴環(huán)能燃氣發(fā)電設備有限公司
        • 服務(wù)熱線(xiàn)

          0531-62325028
          0531-69951266

        放置了半年的焦化發(fā)電機組需要做哪些檢測

        放置了半年的焦化發(fā)電機組需要做哪些檢測呢?實(shí)際上不算很難,一般的要做以下幾點(diǎn)檢查:
        What tests should be done for the coking generator set that has been placed for half a year? In fact, it is not very difficult. Generally, the following checks are required:
        1、檢查機組的啟動(dòng)成功率
        1. Check the startup success rate of the unit
        試驗方法:試驗應在符合產(chǎn)品技術(shù)條件規定的準備啟動(dòng)狀態(tài)下,每給一個(gè)啟動(dòng)指令,啟動(dòng)成功后突加功率為1.0的50% 的額定負載運行5min,再停機。試驗100次。啟動(dòng)成功率應大于99%。否則,則認為此項不合格。
        Test method: the test shall be carried out in the ready to start state in accordance with the technical conditions of the product. After each start command is given, the test shall be conducted with 50% of the rated load of 1.0 for 5min and then shut down. 100 tests. The startup success rate shall be greater than 99%. Otherwise, it is considered as unqualified.
        2、檢查機組平均故障間隔期
        2. Check the mean time between failures of the unit
        檢查方法:機組帶cosФ=0.8的額定負載,連續或累計運行1000h以上,焦化機、發(fā)電機均不應出現故障,控制電路的 元件不應出現二次以上故障,否則,則認為此項不合格。此項指標允許在實(shí)際運行中進(jìn)行考核。
        Inspection method: unit with cos Ф= 0.8 rated load, continuous or cumulative operation for more than 1000h, the coking machine and generator shall not have fault, and the elements of the control circuit shall not have more than two faults, otherwise, this item is considered unqualified. This indicator can be evaluated in actual operation.
        3、檢查機組帶可控硅負載的運行情況
        3. Check the operation of the unit with thyristor load
        試驗方法:機組帶cosФ≥0.5的三相可控硅整流器負載,在機組額定容量的10%~50%范圍內任一點(diǎn)上均應能穩定工作 。如果產(chǎn)生低頻振蕩,應實(shí)行調整,使之能穩定工作,否則認為此項不合格。
        Test method: unit with cos Ф The load of three-phase thyristor rectifier ≥ 0.5 shall be able to work stably at any point within the range of 10% ~ 50% of the rated capacity of the unit. If low-frequency oscillation occurs, it shall be adjusted to make it work stably. Otherwise, it is considered unqualified.
        焦化發(fā)電機組
        4、檢查自動(dòng)化機組的聯(lián)動(dòng)試
        4. Check the linkage test of the automatic unit
        檢查方法:兩臺機組應互為主備用,任選一臺作主用,人為切斷市電,主用機組自動(dòng)啟動(dòng)成功后供電。制造一個(gè)故障 ,使主用機組自動(dòng)停機備用機組則應自動(dòng)成功后供電。使市電恢復后,備用機組應級自動(dòng)停機。如不合格,找出原因,排 除故障。兩臺機組分別為主用,復試三次,如仍有一次不合格,則認為此項不合格。
        Inspection method: two units shall be used as main and standby for each other, and one unit shall be selected as the main one. The mains power shall be cut off manually, and the power supply shall be supplied after the main unit is automatically started successfully. If a fault is caused, the main unit will automatically shut down, and the standby unit will automatically supply power after success. After the mains power is restored, the standby unit shall stop automatically. If unqualified, find out the reason and eliminate the fault. The two units are mainly used and retested for three times. If one is still unqualified, it is considered as unqualified.
        5、檢查自動(dòng)化焦化發(fā)電機組自動(dòng)啟動(dòng)功能
        5. Check the automatic startup function of the automatic coking generator set
        試驗方法:接通啟動(dòng)電源,將機組工作方式選擇開(kāi)關(guān)搬向自動(dòng),送入啟動(dòng)指令,并且人為使機組啟動(dòng)不成功,機組應 自動(dòng)啟動(dòng)三次。
        Test method: connect the startup power supply, move the unit working mode selection switch to automatic, and send the startup command. If the unit fails to be started manually, the unit shall be started automatically for three times.
        試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
        If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
        6、檢查自動(dòng)化機組的自動(dòng)補給裝置
        6. Check the automatic supply device of the automatic unit
        試驗方法:在控制電路電路完全聯(lián)結完畢后,將工作方式選擇開(kāi)關(guān)搬向自動(dòng)人為放水放油至低液位,應能自動(dòng)補給, 當液面上升到高液位時(shí)補給應能自動(dòng)停止。
        Test method: after the control circuit is fully connected, move the working mode selection switch to automatic manual water and oil drainage to the low level, which shall be able to automatically replenish. When the liquid level rises to the high level, the replenishment shall be able to automatically stop.
        試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
        If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
        此外也要檢查自動(dòng)化機組的保護性、檢查自動(dòng)化機組的冷卻水、機油加熱等事項,更多檢查項目合格才能進(jìn)行下一步 使用,詳情就來(lái)我們網(wǎng)站http://m.elmasticar.com聯(lián)系了解吧。
        In addition, it is also necessary to check the protection of the automatic unit, check the cooling water and oil heating of the automatic unit. More inspection items can be used in the next step only if they are qualified. Please visit our website for details http://www.huannengpower. Contact me to understand.
        RM新时代app下载-首页

          <menu id="icv9r"></menu>
          <dd id="icv9r"><meter id="icv9r"></meter></dd>
          <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
          1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

              1. <menu id="icv9r"></menu>
                <dd id="icv9r"><meter id="icv9r"></meter></dd>
                <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
                1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

                  1. RM新时代平台网址 RM新时代新项目-百度知道 RM新时代官网 RM新时代新项目-百度知道 RM新时代平台网址 rm新时代足球交易平台 新时代官方下载 RM新时代怎么下载 RM新时代网站 RM新时代正规平台入口