RM新时代app下载-首页

    <menu id="icv9r"></menu>
    <dd id="icv9r"><meter id="icv9r"></meter></dd>
    <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
    1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

      1. 歡迎進(jìn)入濟南濟柴環(huán)能燃氣發(fā)電設備有限公司官網(wǎng)!

        發(fā)電機知識

        柴油發(fā)電機組組裝程序有哪些?

        返回 2022.02.15 來(lái)源:http://m.elmasticar.com 0
        一一般裝配程序
        I. General Assembly procedure
        準備工作
        preparation
        在裝配柴油機以前,應將進(jìn)氣管墊排氣管墊汽缸蓋出水管墊水泵與汽缸蓋出水管接口墊片石棉紙電工刀小木錘公斤力扳手套筒開(kāi)口扳手梅花扳手及其他與裝配有關(guān)的零件和工具全部備齊,防止在裝配時(shí)缺東少西,力爭達到完美。對于應該進(jìn)行清洗除塵除銹的零部件要全部清洗干凈。
        Before assembling the diesel engine, the intake pipe gasket, exhaust pipe gasket, cylinder head outlet pipe gasket, water pump and cylinder head outlet pipe interface gasket, asbestos paper electrician knife, small wooden hammer, kilogram wrench, socket open-ended wrench, box wrench and other parts and tools related to assembly shall be prepared to prevent lack of East and West during assembly and strive to achieve perfection. All parts that should be cleaned, dedusted and derusted shall be cleaned.
        部件裝配
        Component assembly
        柴油發(fā)電機部件裝配就是將零件按照一定的裝配要求,組裝成總成部件或組件。
        焦化發(fā)電機組
        The assembly of diesel generator parts is to assemble the parts into assembly parts or components according to certain assembly requirements.
        總裝
        Final assembly
        總裝就是將各分部件或零件按照一定的要求和順序由里向外進(jìn)行裝配,在裝配過(guò)程中,要注意進(jìn)行各機件的相對位置和配合間隙及油水的密封性試驗,例如汽缸套水泵等的密封試驗。
        General assembly is to assemble all sub parts or parts from inside to outside according to certain requirements and sequences. During the assembly process, pay attention to the relative position and fit clearance of all parts and the sealing test of oil and water, such as the sealing test of cylinder liner water pump.
        總裝后的檢查與調整
        Inspection and adjustment after final assembly
        總裝后要對氣門(mén)間隙配氣定時(shí)供油定時(shí)進(jìn)行檢查與調整。完成上述工作后再進(jìn)行試機。
        After assembly, check and adjust the valve clearance, valve timing and oil supply timing. The test run shall be carried out after the above work is completed.
        二部件裝配及要求
        II. Assembly and requirements of components
        部件裝配是一項復雜精細的工作,決不能漏裝,裝配力矩要適當。
        Component assembly is a complex and delicate work. It must not be omitted, and the assembly torque should be appropriate.
        汽缸蓋的裝配
        Cylinder head assembly
        活塞連桿組件的裝配
        Assembly of piston connecting rod assembly
        以上就是今天帶給大家的知識焦化發(fā)電機組專(zhuān)注行業(yè)多年,為用戶(hù)不斷的提供有價(jià)值的內容,更多內容請繼續關(guān)注我們:http://m.elmasticar.com
        The above is the knowledge brought to you today. The coking generator set has focused on the industry for many years and continuously provides valuable content for users. Please continue to pay attention to us for more content: http://m.elmasticar.com
        新聞搜索
        濟南濟柴環(huán)能燃氣發(fā)電設備有限公司
        • 服務(wù)熱線(xiàn)

          0531-62325028
          0531-69951266

        柴油發(fā)電機組組裝程序有哪些?

        一一般裝配程序
        I. General Assembly procedure
        準備工作
        preparation
        在裝配柴油機以前,應將進(jìn)氣管墊排氣管墊汽缸蓋出水管墊水泵與汽缸蓋出水管接口墊片石棉紙電工刀小木錘公斤力扳手套筒開(kāi)口扳手梅花扳手及其他與裝配有關(guān)的零件和工具全部備齊,防止在裝配時(shí)缺東少西,力爭達到完美。對于應該進(jìn)行清洗除塵除銹的零部件要全部清洗干凈。
        Before assembling the diesel engine, the intake pipe gasket, exhaust pipe gasket, cylinder head outlet pipe gasket, water pump and cylinder head outlet pipe interface gasket, asbestos paper electrician knife, small wooden hammer, kilogram wrench, socket open-ended wrench, box wrench and other parts and tools related to assembly shall be prepared to prevent lack of East and West during assembly and strive to achieve perfection. All parts that should be cleaned, dedusted and derusted shall be cleaned.
        部件裝配
        Component assembly
        柴油發(fā)電機部件裝配就是將零件按照一定的裝配要求,組裝成總成部件或組件。
        焦化發(fā)電機組
        The assembly of diesel generator parts is to assemble the parts into assembly parts or components according to certain assembly requirements.
        總裝
        Final assembly
        總裝就是將各分部件或零件按照一定的要求和順序由里向外進(jìn)行裝配,在裝配過(guò)程中,要注意進(jìn)行各機件的相對位置和配合間隙及油水的密封性試驗,例如汽缸套水泵等的密封試驗。
        General assembly is to assemble all sub parts or parts from inside to outside according to certain requirements and sequences. During the assembly process, pay attention to the relative position and fit clearance of all parts and the sealing test of oil and water, such as the sealing test of cylinder liner water pump.
        總裝后的檢查與調整
        Inspection and adjustment after final assembly
        總裝后要對氣門(mén)間隙配氣定時(shí)供油定時(shí)進(jìn)行檢查與調整。完成上述工作后再進(jìn)行試機。
        After assembly, check and adjust the valve clearance, valve timing and oil supply timing. The test run shall be carried out after the above work is completed.
        二部件裝配及要求
        II. Assembly and requirements of components
        部件裝配是一項復雜精細的工作,決不能漏裝,裝配力矩要適當。
        Component assembly is a complex and delicate work. It must not be omitted, and the assembly torque should be appropriate.
        汽缸蓋的裝配
        Cylinder head assembly
        活塞連桿組件的裝配
        Assembly of piston connecting rod assembly
        以上就是今天帶給大家的知識焦化發(fā)電機組專(zhuān)注行業(yè)多年,為用戶(hù)不斷的提供有價(jià)值的內容,更多內容請繼續關(guān)注我們:http://m.elmasticar.com
        The above is the knowledge brought to you today. The coking generator set has focused on the industry for many years and continuously provides valuable content for users. Please continue to pay attention to us for more content: http://m.elmasticar.com
        RM新时代app下载-首页

          <menu id="icv9r"></menu>
          <dd id="icv9r"><meter id="icv9r"></meter></dd>
          <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
          1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

              1. <menu id="icv9r"></menu>
                <dd id="icv9r"><meter id="icv9r"></meter></dd>
                <tbody id="icv9r"><meter id="icv9r"><var id="icv9r"></var></meter></tbody>
                1. <tbody id="icv9r"><nobr id="icv9r"></nobr></tbody><strong id="icv9r"><delect id="icv9r"><dl id="icv9r"></dl></delect></strong>

                  1. RM新时代平台网址 RM新时代新项目-百度知道 RM新时代官网 RM新时代新项目-百度知道 RM新时代平台网址 rm新时代足球交易平台 新时代官方下载 RM新时代怎么下载 RM新时代网站 RM新时代正规平台入口